SAP PO to SAP Integration Suite · Timeline calculator
How long will your SAP PO migration take?
Enter your number of ICOs and get an indicative timeline, with and without the Rojo migration approach. It takes about a minute.
1
Your SAP PO landscape
Your SAP PO team, or the SAP Migration Assessment, can give you the ICO count.
Example: 500 ICOs. Drag the slider or type your own number.
Number of ICOsiICOs (Integrated Configuration objects) are the integration scenarios configured in your SAP PO system. A rough number is fine: the plan shows a range. We plan on a standard 1 ICO = 2 interfaces. The estimator covers up to 3,000 ICOs.
53,000
I already know my interface count (optional)Number of interfaces
Count distinct interfaces (sender, receiver and mapping combinations), not message-mapping rows. If you fill this in, it replaces the 2-per-ICO conversion.
Include a platform review and governance phaseiNaming, guidelines and set-up of SAP Integration Suite before migration starts. Adds 1 month to the plan.
✓
Your plan includes a 2-month pre-project and pilot
It shows how the whole migration will run before the main work starts.
2
See your full planYour migration timeline
Get your full migration plan
Leave your details to unlock the full plan on this page, download it as a PDF and receive a copy by email.
- The phases of your plan, month by month
- Why your plan includes a pre-project
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Your full plan is unlocked below. A copy is on its way to your inbox.
Download as PDF- This is an indicative planning estimate, not an offer. A firm plan needs your SAP Migration Assessment and a scoping conversation.